Archives

Posts Tagged ‘bids’

Tutor Perini won the bid for the first segment of HSR construction – but they didn’t wind the second bid. That went to a team led by Spain’s Dragados, alongside Flatiron West of San Marcos and Shimmick of Oakland: Dragados/Flatiron/Shimmick submitted a bid of $1.23 billion to design and build the 65-mile stretch from the […]

Dec 12th, 2014 | Filed under Uncategorized

And then there were three: Two would-be contenders for a contract to design and build the second stretch of a high-speed train line through the San Joaquin Valley have dropped out of the competition, leaving the California High-Speed Rail Authority with three contractors chasing the job. The withdrawal of the two contracting teams potentially reduces […]

Aug 27th, 2014 | Filed under Uncategorized

The California High Speed Rail Authority is issuing a request for proposals to five bidding consortiums who met the prequalification requirements. According to the Fresno Bee they include the winner of the first HSR construction segment from Madera to Fresno, Tutor Perini/Zachry/Parsons: Among the construction teams that were pre-qualified earlier this year to bid on […]

Apr 3rd, 2014 | Filed under Uncategorized

The California High Speed Rail Authority is moving ahead with its plans for the second phase of HSR construction in the Central Valley – a 60 mile segment from Fresno to the Tulare-Kern County line. Five bids have been received: • California Rail Builders: Ferrovial Agroman US Corp. and Granite Construction Company • Dragados/Flatiron/Shimmick: Dragados […]

Dec 19th, 2013 | Filed under Uncategorized